Pre- and post-construction termite treatment for a residential villa, including soil injection and protective barrier installation.
Working with a residential villa under construction, SkyStar applied a full pre-construction termite protection program: soil treatment around the foundation trenches, drilling and injecting termiticide along interior baseboards, and installing protective barriers before final flooring was laid.
The team followed up with a post-construction inspection to confirm the treated areas remained protected and free of termite activity.
Frequently Asked Questions About Termite Control Before and After Construction
1. How is termite control carried out before construction?
Pre-construction termite control begins with soil treatment around foundation trenches and the implementation of appropriate preventive measures in areas at risk of termite infestation.
2. Does the treatment include soil injection for termite control?
Yes. The program includes drilling and injecting termite treatment along the bases of internal walls as part of the protective measures carried out during the construction stage.
3. What is the role of protective barriers in termite control?
Protective barriers are installed before the final flooring is laid as part of the termite protection program during the construction stages.
4. Is termite control monitored after construction is completed?
Yes. The service includes a post-construction inspection to monitor treated areas and ensure that there are no signs of termite activity.
5. What does the termite protection program for villas include?
The program includes soil treatment for termite control, termite treatment injection, installation of protective barriers, and a post-construction inspection to monitor the treated areas and ensure continued protection.